Inspection timing should match the product's risk, value, and how difficult a defect is to correct later.
Practical sourcing insight
- Pre-production review confirms the specification, materials, artwork, and acceptance criteria before volume work begins.
- During-production inspection identifies process problems while corrective action is still practical.
- Final inspection checks finished goods, packaging, quantity, and visible defects before the balance is released or shipment is booked.
